C Shower FloorCyprus * Important: should you be installing the Cyprus Shower Floor by providing a boxed opening under the waste, such boxed opening in slab must not exceed 200mm in width underneath the Cyprus Shower Floor. Once installed as described above, backfill any opening in slab with a 4:1 Washed Sand and Cement Mix, ensuring the mortar is packed tightly around waste outlet and all the way back into the boxed section of the slab and up to the underside of the Cyprus Shower Floor to provide it with full support around the outlet. Note: Where required by regulations, plastic pipe & fittings may need to be lagged prior to back filling. D. WASTE INSTALLATION 6 1. To installthe Waste outlet,thread it into the Cyprus Shower Floor in an anti- 2” BSP clockwise direction, and secure firmly. Refer also to the instructions which are enclosed with the waste outlet itself. 2. If installing over a Smart-Pan, ensure a connector piece of about 100mm in length is firmly threaded to the outlet, before it is fitted (look E.1). 3. It is recommended installation practice to check the edge of the Cyprus Shower Floor into the wall by the thickness of the cladding material in order to provide a leak-free joint with the wall cladding material. 4. in order to ensure the longevity of the installation, a leak-free joint with wallcladding material is to be created. Use anti-fungal sealant, a Flushing or Sealing Tape where the wall meats the Cyprus Shower Floor. If an anti-fungal silicone was used on edges of the Cyprus Shower Floor - allow to dry for 24 hours before proceeding with installation work. 5. Important to all installation types: When using Smart-Pan the lid needs to be cut out to the size and position of the Waste outlet pipe (must not be removed) and repositioned over the opening. This lid support is mandatory. 6. Protective film must be removed from allsurfaces to which it is applied prior to sealing them to surrounding surfaces. Failure to remove the film may result in leakages. 34